Next Level Exteriors
Composite Decking / Wasatch Front

Composite decks that last as long as the house does.

Trex, TimberTech, and Fiberon. The right material for your home, not the one we have left in the truck.

Why this matters

Composite is the only deck material that makes sense for most Utah homes now. The price has come down. The look has gotten better. The warranties run 25 to 50 years. We build with Trex (our main line as Trex Pro installers), TimberTech, and Fiberon depending on what fits the house and the budget. Jake walks the site, talks through the trade-offs, and gives you a real number. No catalog flipping.

01
Three lines, one builder.

Trex, TimberTech, and Fiberon. We are not married to one brand. We pick the one that fits your home.

02
Engineered substructure.

We build the frame to outlast the boards. Most failures happen below the deck, not on top of it.

03
Owner-quoted.

Jake walks the site himself. The number you get is the number you pay.

What's included

Every job, every time.

  • Material recommendation across Trex, TimberTech, and Fiberon
  • Engineered substructure and lateral bracing
  • Hidden fastener system
  • Custom railings and stairs
  • Permits and HOA paperwork
  • Daily site cleanup
  • Workmanship warranty
FAQ

Common questions about this build.

How long does a Trex deck last in Utah?+

A properly installed Trex deck lasts 25 to 50 years in Utah weather. The warranty backs that up. By contrast, pressure-treated wood typically needs replacement at the 10 to 15 year mark in our freeze-thaw climate.

What's the warranty on a Trex deck?+

Trex Transcend carries a 25-year limited warranty plus a 25-year fade and stain warranty. Select and Enhance both carry 25-year limited warranties. Our workmanship warranty covers the build itself.

Do you handle the building permit?+

Yes. We pull every permit and schedule every inspection. You don't talk to the city.

How long does a deck take to build?+

Most decks finish in 5 to 10 working days. Larger outdoor rooms with pergolas and lighting can run 10 to 15 days.

What is your payment schedule?+

A deposit at contract signing, a progress payment when the substructure is approved by inspection, and final payment on completion. We never ask for the full price upfront.

In their words
"We absolutely love our new deck! Jake and his crew were so easy to work with because they are knowledgeable and professional. We started out small but decided to go big! There were no surprises and it was done in just over a week, several days before the deadline we had given them."
Rachel M. / Sandy, UT
Start here

Tell us about your project.

Talk to Jake directly

Give us a call and we'll book your free site walk on the spot.

Jake answers his own phone. One call, one honest estimate — no commissioned salespeople, no follow-up spam.

Call 385.888.3113
Begin

Your deck. Built once.
Built right.

Tell us about the space. Jake walks the property within 48 hours, leaves a real number, and you decide from there.