Mountain-side decks for Draper and SunCrest.
Engineered for slope, snow, and wind. HOA templates already on file.
Draper is split between the older homes near 12300 South and the newer mountain-side builds up in Suncrest and SunCrest Ridge. The mountain builds are our specialty here: engineered for slope, snow, and wind. We have HOA templates for Suncrest already on file.
What we know about building in Draper.
- 01
Draper permits run 7 to 14 business days
- 02
Mountain-side builds need stamped wind and slope calcs
- 03
SunCrest HOA pre-approval typically takes 2 to 3 weeks
- 04
Most Suncrest decks use Trex Transcend for UV resistance
Questions from Draper homeowners.
How long does the quote process take?+
Jake walks the site within 48 hours of your inquiry. He brings real numbers, not a brochure. You get a written quote within 24 hours of that visit.
Do you handle the building permit?+
Yes. We pull every permit and schedule every inspection. You don't talk to the city.
Do you work with HOAs?+
Yes. We have submitted to most major Wasatch Front HOAs and have templates on file for the most common ones (Pepperwood, Suncrest, Daybreak, Glenwild, Promontory, and others).
How long does a Trex deck last in Utah?+
A properly installed Trex deck lasts 25 to 50 years in Utah weather. The warranty backs that up. By contrast, pressure-treated wood typically needs replacement at the 10 to 15 year mark in our freeze-thaw climate.
How long does a deck take to build?+
Most decks finish in 5 to 10 working days. Larger outdoor rooms with pergolas and lighting can run 10 to 15 days.
Tell us about your Draper project.
Give us a call and we'll book your free site walk on the spot.
Jake answers his own phone. One call, one honest estimate — no commissioned salespeople, no follow-up spam.
Call 385.888.3113Your deck. Built once.
Built right.
Tell us about the space. Jake walks the property within 48 hours, leaves a real number, and you decide from there.
