Next Level Exteriors
Journal · 11 min read

Multi-Level Decks and Stairs on a Utah Hillside

Building decks on Wasatch Front slopes: footings on grade, landing and stair code, retaining considerations, and what a multi-level build really costs.

Published June 24, 2026By Next Level Exteriors

A large share of the lots we build on are not flat. Draper benches, Suncrest, the Cottonwood foothills, Emigration Canyon — the ground falls away from the back door, and a single-level deck either floats twelve feet in the air or dies at a wall of dirt. The answer is usually a multi-level build: an upper deck off the kitchen, a stair run, and a lower terrace that meets grade.

Multi-level work is where deck building stops being carpentry and starts being structure. Here is what changes on a slope, what code requires, and what it costs.

Why hillside lots want more than one level

  • Usable height. A deck more than about 8 feet off grade feels like a balcony. Stepping down splits that into two rooms that both feel grounded.
  • Cheaper than fill. Trucking in and compacting fill to flatten a yard routinely costs more than the entire lower deck.
  • Zoning. Some cities count tall single-level structures differently for setback and height. Stepping down often keeps you inside the easy path.
  • Sun and wind. Upper level for morning coffee, lower level tucked out of the canyon wind for evenings.

Footings and frost depth on a slope

Frost depth along the Wasatch Front runs 30 inches in the valley and deeper as you climb — Park City jurisdictions commonly require 36 inches or more. On a slope, frost depth is measured from the downhill grade at the footing, not from the uphill side. That single detail is the most common thing we find wrong on failed DIY hillside decks.

  • Footings must bear on undisturbed native soil, never on fill or on a previous excavation backfill.
  • Sonotube diameter grows with tributary load; tall posts carrying two levels often need 18 or 24 inch footings rather than the usual 12.
  • Posts over about 8 feet need lateral bracing — knee braces or a braced bay — to handle side load.
  • On steep grade we frequently step footings down the hill rather than pouring one deep monster.

If the slope is steep enough that footings would undermine each other, an engineer's stamp is required. Most Wasatch Front cities ask for one whenever the deck exceeds roughly 10 feet above grade or sits above a retaining wall.

Stairs, landings, and the code that governs them

Stairs are the part homeowners underestimate. A single 12-foot drop is not one stair run — it is two runs and a landing.

RequirementResidential code
Max riser height7 3/4 in
Min tread depth10 in
Riser variation across a run3/8 in max
Landing requiredEvery 12 ft of vertical rise
Landing sizeAt least 36 in in direction of travel
HandrailRequired at 4 or more risers, 34–38 in high, graspable
Stair guard36 in where open side is over 30 in above grade

The 3/8 inch riser variation rule is what fails inspections. On a slope the bottom riser lands on sloped ground, so we pour a concrete pad or set a landing frame to give the last step a true, level surface.

Drainage and what lives under the deck

Water moves downhill toward your foundation, and a deck changes how it gets there. On every hillside build we look at three things:

  1. Positive slope away from the house maintained under the deck — never let a deck become a flat catch basin against the foundation.
  2. Whether the lower level should be a dry space. An under-deck drainage ceiling turns the area beneath the upper level into usable covered patio, which is often the best value add on the whole project.
  3. Gravel and fabric versus concrete under the lower level. Gravel breathes and drains; concrete looks finished but needs its own slope and a plan for snowmelt.

What a multi-level hillside deck costs

Multi-level work carries a real premium over a flat-yard deck of the same total square footage — typically 25 to 45 percent. The extra is in excavation, taller posts, larger footings, framing the second level, and the stair run itself.

ScopeTypical 2026 installed range
Upper deck, 300–400 sq ft, composite, 8–12 ft elevated$38,000 – $58,000
Stair run with landing, 10–14 ft rise$6,500 – $13,000
Lower terrace at grade, 250–350 sq ft$18,000 – $32,000
Under-deck drainage ceiling$18 – $30 / sq ft
Engineering stamp when required$900 – $2,500

A full two-level build on a Draper or Suncrest bench most often lands between $70,000 and $110,000. Compare with our overall Utah deck cost guide, or see typical scopes on the Trex deck page.

Timeline expectations

Plan on a longer runway than a flat build. Permit review on a hillside frequently triggers a second look from a plans examiner, and engineering adds one to three weeks up front. Once we break ground, a two-level build with stairs is usually four to seven weeks of site time depending on excavation access. Read the best time to build in Utah for scheduling strategy.

Key takeaways
  • On a slope, frost depth is measured from the downhill grade — get this wrong and footings heave.
  • Any vertical rise over 12 feet requires an intermediate landing; riser variation must stay within 3/8 inch.
  • Decks above roughly 10 feet or over a retaining wall usually need an engineer's stamp on the Wasatch Front.
  • Multi-level costs 25–45 percent more than an equivalent flat-yard deck, mostly in footings, posts, and stairs.
  • An under-deck drainage ceiling turns the space beneath the upper level into a second usable room.

Frequently asked questions

+Can you build a deck over an existing retaining wall?

Sometimes, but never bearing on the wall. Footings have to go beside or behind the wall on undisturbed soil so the deck load never pushes on it. Most cities require an engineer to review that condition, and we always get one.

+How much does a stair run add to the price?

A code-compliant exterior stair with a landing on a 10 to 14 foot rise runs $6,500 to $13,000 in 2026, depending on width, railing system, and whether we pour a landing pad at the bottom.

+Is a hillside deck safe long term in Utah?

Yes, when the footings bear on native soil below frost and the posts are properly braced. Every failure we have been called to inspect traces back to shallow footings, fill under a footing, or missing lateral bracing — not to the slope itself.

Get a real quote for your project

Jake walks every site himself. Quoted in 48 hours.

Continue reading
Begin

Your deck. Built once.
Built right.

Tell us about the space. Jake walks the property within 48 hours, leaves a real number, and you decide from there.